SHC have recently been awarded the enabling works to the second phase at Bude. This will initial consist of 30 plots & partial installation of the site road which links onto phase 1. Prior to construction of the phase 2 plots, some main service works had to take place on this phase. This included an overhead cables diversion as well as a water main diversion through the site.

Bellevue, Bude

SHC are continuing construction on phase 1 at Bellevue Bude, this has included installation 6,500m² of road, around 3,250m of drainage and installing 3 attenuation basins. An attenuation basin works by preventing flooding by controlling the amount of stormwater that is released into the environment at any given time. When a storm event occurs, the attenuation basin simply fills up and stores large volumes of rainwater temporarily. The site comprises of 144 units including detached, semi-detached and terraced plots which are all traditional strip foundations.

Equinox Phase 2, Exeter

Following on from the first phase located just over the road, Phase 2 consists of 81 Plots and associated infrastructure. Equinox Phase 2 is part of the wider development in this area where a new community is being formed which will eventually see a fully equipped sports field, allotments, Park and Ride services to Exeter, plus new local shops and businesses, along with a planned primary school. This phase has included the installation of 2,600m² of road and a SDS attenuation tank. SHC are now constructing the last 15 plots on this phase